Probabilistic transmission system planning / (Record no. 59768)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 04860nam a2201165 i 4500 |
001 - CONTROL NUMBER | |
control field | 5732783 |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20200421114236.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 151221s2011 nju ob 001 eng d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
ISBN | 9780470932117 |
-- | ebook |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
-- | |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
-- | electronic |
082 04 - CLASSIFICATION NUMBER | |
Call Number | 621.319 |
100 1# - AUTHOR NAME | |
Author | Li, Wenyuan, |
245 10 - TITLE STATEMENT | |
Title | Probabilistic transmission system planning / |
300 ## - PHYSICAL DESCRIPTION | |
Number of Pages | 1 PDF (320 pages). |
490 1# - SERIES STATEMENT | |
Series statement | IEEE press series on power engineering ; |
505 0# - FORMATTED CONTENTS NOTE | |
Remark 2 | Basic Concepts of Probabilistic Planning -- Load Modeling -- System Analysis Techniques -- Probabilistic Reliability Evaluation -- Economic Analysis Methods -- Data in Probabilistic Transmission Planning -- Fuzzy Techniques for Data Uncertainty -- Network Reinforcement Planning -- Retirement Planning of Network Components -- Substation Planning -- Single-Circuit Supply System Planning -- Appendix A: Elements of Probability Theory and Statistics -- Appendix B: Elements of Fuzzy Mathematics -- Appendix C: Elements of Reliability Evaluation -- References -- Index -- IEEE Press Series on Power Engineering. |
520 ## - SUMMARY, ETC. | |
Summary, etc | "The book is composed of 12 chapters and three appendices, and can be divided into four parts. The first part includes Chapters 2 to 7, which discuss the concepts, models, methods and data in probabilistic transmission planning. The second part, Chapters 8 to 11, addresses four essential issues in probabilistic transmission planning applications using actual utility systems as examples. Chapter 12, as the third part, focuses on a special issue, i.e. how to deal with uncertainty of data in probabilistic transmission planning. The fourth part consists of three appendices, which provide the basic knowledge in mathematics for probabilistic planning. Please refer to the attached table of contents which is given in a very detailed manner"-- |
650 #0 - SUBJECT ADDED ENTRY--SUBJECT 1 | |
General subdivision | Planning |
-- | Statistical methods. |
856 42 - ELECTRONIC LOCATION AND ACCESS | |
Uniform Resource Identifier | http://ieeexplore.ieee.org/xpl/bkabstractplus.jsp?bkn=5732783 |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | eBooks |
264 #1 - | |
-- | Hoboken, New Jersey : |
-- | Wiley-IEEE Press, |
-- | 2011. |
264 #2 - | |
-- | [Piscataqay, New Jersey] : |
-- | IEEE Xplore, |
-- | [2011] |
336 ## - | |
-- | text |
-- | rdacontent |
337 ## - | |
-- | electronic |
-- | isbdmedia |
338 ## - | |
-- | online resource |
-- | rdacarrier |
520 ## - SUMMARY, ETC. | |
-- | Provided by publisher. |
588 ## - | |
-- | Description based on PDF viewed 12/21/2015. |
650 #0 - SUBJECT ADDED ENTRY--SUBJECT 1 | |
-- | Electric power transmission |
650 #0 - SUBJECT ADDED ENTRY--SUBJECT 1 | |
-- | Probabilities. |
695 ## - | |
-- | Absorption |
695 ## - | |
-- | Advertising |
695 ## - | |
-- | Aging |
695 ## - | |
-- | Bibliographies |
695 ## - | |
-- | Cable shielding |
695 ## - | |
-- | Companies |
695 ## - | |
-- | Conductors |
695 ## - | |
-- | Correlation |
695 ## - | |
-- | Density functional theory |
695 ## - | |
-- | Economic indicators |
695 ## - | |
-- | Economics |
695 ## - | |
-- | Equations |
695 ## - | |
-- | Finance |
695 ## - | |
-- | Fuzzy sets |
695 ## - | |
-- | Gaussian distribution |
695 ## - | |
-- | Gold |
695 ## - | |
-- | HVDC transmission |
695 ## - | |
-- | IEEE Press |
695 ## - | |
-- | Indexes |
695 ## - | |
-- | Investments |
695 ## - | |
-- | Load flow |
695 ## - | |
-- | Load forecasting |
695 ## - | |
-- | Load modeling |
695 ## - | |
-- | Maintenance engineering |
695 ## - | |
-- | Markov processes |
695 ## - | |
-- | Mathematical model |
695 ## - | |
-- | Meteorology |
695 ## - | |
-- | Planning |
695 ## - | |
-- | Power cable insulation |
695 ## - | |
-- | Power cables |
695 ## - | |
-- | Power supplies |
695 ## - | |
-- | Power system reliability |
695 ## - | |
-- | Power system stability |
695 ## - | |
-- | Prediction theory |
695 ## - | |
-- | Probabilistic logic |
695 ## - | |
-- | Random variables |
695 ## - | |
-- | Reliability |
695 ## - | |
-- | Resistance |
695 ## - | |
-- | Retirement |
695 ## - | |
-- | Sections |
695 ## - | |
-- | Security |
695 ## - | |
-- | Shape |
695 ## - | |
-- | Stability analysis |
695 ## - | |
-- | Stability criteria |
695 ## - | |
-- | Substations |
695 ## - | |
-- | Switches |
695 ## - | |
-- | Switching circuits |
695 ## - | |
-- | Thermal stability |
695 ## - | |
-- | Time frequency analysis |
695 ## - | |
-- | Timing |
695 ## - | |
-- | Transient analysis |
695 ## - | |
-- | Transmission line measurements |
695 ## - | |
-- | Transmission lines |
695 ## - | |
-- | Uncertainty |
695 ## - | |
-- | Weibull distribution |
No items available.