000 | 04620cam a2200493Ia 4500 | ||
---|---|---|---|
001 | on1112426550 | ||
003 | OCoLC | ||
005 | 20220711203530.0 | ||
006 | m d | ||
007 | cr un|---aucuu | ||
008 | 190831s2019 enk ob 001 0 eng d | ||
040 |
_aEBLCP _beng _cEBLCP _dDG1 _dOCLCF _dUKAHL |
||
020 | _a9781119649205 | ||
020 | _a111964920X | ||
020 |
_a9781119649229 _q(electronic bk. : oBook) |
||
020 |
_a1119649226 _q(electronic bk. : oBook) |
||
020 | _z9781786303875 | ||
029 | 1 |
_aAU@ _b000066005778 |
|
035 | _a(OCoLC)1112426550 | ||
050 | 4 | _aTF507 | |
082 | 0 | 4 |
_a385 _223 |
049 | _aMAIN | ||
100 | 1 |
_aBensalah, Mounir. _98542 |
|
245 | 1 | 0 |
_aRailway Information Modeling RIM _h[electronic resource] : _bTrack to Rail Modernization / _cMounir Bensalah, Abdelmajid Elouadi, Hassan Mharzi. |
260 |
_aLondon : _bISTE, Ltd. ; _aHoboken : _bWiley, _c2019. |
||
300 | _a1 online resource (170 p.) | ||
500 | _aDescription based upon print version of record. | ||
505 | 0 | _aCover; Half-Title Page; Title Page; Copyright Page; Contents; Acknowledgments; General Introduction; 1. Introduction to BIM Integration into Railway; 1.1. Introduction; 1.2. Methodology; 1.3. Railway -- formulation of the problem; 1.4. BIM development; 1.5. BIM integration into railway projects; 1.6. Feedback from real project experiences; 1.6.1. Project Mälarbanan, Sweden; 1.6.2. TUC/Infrabel experience, Belgium; 1.6.3. BIM at SNCF maintenance department, France; 1.6.4. Crossrail, UK; 1.6.5. ONCF electrical substation, Morocco; 1.7. Discussion of the results; 1.8. Conclusions and perspectives | |
505 | 8 | _a2. BIM into Railway: Optimization of Cost by Using BIM2.1. Introduction; 2.2. Methodology; 2.3. Cost structure of a tram -- assumptions fixed for the analysis; 2.3.1. Cost structure of a tramway -- construction phase: comparative analysis; 2.3.2. Hypotheses made for the fixed and studied sub-costs in the construction phase; 2.3.3. Cost of facility maintenance; 2.3.4. Summary of costs studied -- basic hypotheses of the analysis; 2.4. Optimization of cost of a tram through the integration of BIM: a theoretical analysis; 2.4.1. Theoretical analysis of cost optimization; 2.4.2. Summary | |
505 | 8 | _a2.4.3. Discussion and analysis2.4.4. Limitations; 2.5. Conclusions and perspectives; 3. BIM and Sustainability; 3.1. Introduction; 3.2. Optimizing the use of materials for durability; 3.3. Energy efficiency; 3.4. Sustainability in the management of the life cycle; 3.5. Sustainability BIM and railway?; 3.6. Discussion of the results; 3.7. Conclusions and perspectives; 4. BIM Integration to Railway Projects -Case Study; 4.1. Introduction; 4.2. Methodology; 4.3. Integrating BIM into railway projects: review of experiences; 4.3.1. Focus on BIM | |
505 | 8 | _a4.3.2. Building information modeling: a literature review4.3.3. BIM software examples; 4.4. Integrating BIM into railway projects: review of experiences; 4.4.1. Crossrail, UK; 4.4.2. Infrabel, Belgium; 4.4.3. STA, Sweden; 4.4.4. BIM France, France; 4.4.5. NNRA, Norway; 4.4.6. Summary and discussion of the review of experiences; 4.5. ONCF/Colas Rail Maroc electrical substation -- BIM integration; 4.5.1. Context of the collaboration; 4.5.2. Methodology; 4.5.3. Key step and planning of realization; 4.5.4. Comments on the results; 4.5.5. Recommendations; 4.6. General discussion | |
505 | 8 | _a4.7. Conclusions and perspectives5. How to Successfully Integrate BIM into a Railway Project -- Framework; 5.1. Framework for the adoption and implementation of BIM -- literature review; 5.2. Summary; 5.3. Framework for the adoption and implementation of BIM -- experience review; 5.3.1. BIM charter; 5.4. Conclusions of the case study; 5.4.1. Systra; 5.4.2. Egis; 5.4.3. Setec; 5.4.4. Colas Rail; 5.5. Discussion of the results; 5.6. Conclusions and perspectives; 6. Railway Information Modeling -- Project Management; 6.1. Reminder of the fundamentals of BIM | |
500 | _a6.2. BIM and legal environment of the projects | ||
504 | _aIncludes bibliographical references and index. | ||
650 | 0 |
_aRailroads _xData processing. _98543 |
|
650 | 7 |
_aRailroads _xData processing. _2fast _0(OCoLC)fst01088845 _98543 |
|
655 | 4 |
_aElectronic books. _93294 |
|
700 | 1 |
_aElouadi, Abdelmajid. _98544 |
|
700 | 1 |
_aMharzi, Hassan. _98545 |
|
776 | 0 | 8 |
_iPrint version: _aBensalah, Mounir _tRailway Information Modeling RIM : Track to Rail Modernization _dNewark : John Wiley & Sons, Incorporated,c2019 _z9781786303875 |
856 | 4 | 0 |
_uhttps://doi.org/10.1002/9781119649229 _zWiley Online Library |
942 | _cEBK | ||
994 |
_a92 _bDG1 |
||
999 |
_c69130 _d69130 |