000 | 03715cam a2200661Ia 4500 | ||
---|---|---|---|
001 | 9780429124327 | ||
003 | FlBoTFG | ||
005 | 20220711211938.0 | ||
006 | m o d | ||
007 | cr cnu---unuuu | ||
008 | 090529s2001 flua ob 001 0 eng d | ||
040 |
_aOCoLC-P _beng _cOCoLC-P |
||
020 |
_a9780429124327 _q(electronic bk.) |
||
020 |
_a0429124325 _q(electronic bk.) |
||
020 |
_a9781420050004 _q(electronic bk.) |
||
020 |
_a1420050001 _q(electronic bk.) |
||
020 |
_a9780429540226 _q(electronic bk. : Mobipocket) |
||
020 |
_a0429540221 _q(electronic bk. : Mobipocket) |
||
020 |
_a9780429525520 _q(electronic bk. : EPUB) |
||
020 |
_a0429525524 _q(electronic bk. : EPUB) |
||
020 | _z9780849309960 | ||
024 | 7 |
_a10.1201/9781420050004 _2doi |
|
035 | _a(OCoLC)314648705 | ||
035 | _a(OCoLC-P)314648705 | ||
050 | 4 |
_aTS155.6 _b.O68 2001 |
|
072 | 7 |
_aTEC _x009060 _2bisacsh |
|
072 | 7 |
_aTEC _x018000 _2bisacsh |
|
072 | 7 |
_aTEC _x020000 _2bisacsh |
|
072 | 7 |
_aTEC _x040000 _2bisacsh |
|
072 | 7 |
_aCOM _x000000 _2bisacsh |
|
072 | 7 |
_aTBC _2bicssc |
|
082 | 0 | 4 |
_a670.285 _223 |
245 | 0 | 0 |
_aOptimization methods for manufacturing _h[electronic resource] / _ceditor, Cornelius Leondes. |
260 |
_aBoca Raton : _bCRC Press, _c2001. |
||
300 |
_a1 online resource : _billustrations. |
||
336 |
_atext _2rdacontent |
||
337 |
_acomputer _2rdamedia |
||
338 |
_aonline resource _2rdacarrier |
||
490 | 1 |
_aComputer aided design, engineering, and manufacturing systems techniques and applications ; _vv. 4 |
|
505 | 0 | _aChapter 1 Synchronization of Production Rate with Demand Rate in Manufacturing Systems -- chapter 2 Integrated Product and Process Management for Engineering Design in Manufacturing Systems -- chapter 3 Project Selection Problems for Production-Inventory-Distribution Scheduling in Manufacturing Plants -- chapter 4 Computer-Aided and Integrated Manufacturing Systems -- chapter 5 Job-Shop Scheduling for Manufacturing with Random Time Operations -- chapter 6 Failure Diagnosis in Computer-Controlled Systems -- chapter 7 Analysis of Stochastic Models in Manufacturing Systems Pertaining to Repair Machine Failure -- chapter 8 Petri Net Modeling and Scheduling of Automated Manufacturing Systems -- chapter 9 Improvement of Damping Characteristics in Machine Tools in Manufacturing Systems. | |
520 | _aIn the competitive business arena companies must continually strive to create new and better products faster, more efficiently, and more cost effectively than their competitors to gain and keep the competitive advantage. Computer-aided design (CAD), computer-aided engineering (CAE), and computer-aided manufacturing (CAM) are now the industry standa | ||
588 | _aOCLC-licensed vendor bibliographic record. | ||
650 | 0 |
_aMathematical optimization. _94112 |
|
650 | 0 |
_aProduction planning. _96473 |
|
650 | 0 |
_aManufacturing processes. _93276 |
|
650 | 0 |
_aCAD/CAM systems. _911540 |
|
650 | 7 |
_aTECHNOLOGY & ENGINEERING / Industrial Engineering. _2bisacsh _99235 |
|
650 | 7 |
_aTECHNOLOGY & ENGINEERING / Industrial Technology. _2bisacsh _911541 |
|
650 | 7 |
_aTECHNOLOGY & ENGINEERING / Manufacturing. _2bisacsh _911542 |
|
650 | 7 |
_aTECHNOLOGY & ENGINEERING / Technical & Manufacturing Industries & Trades. _2bisacsh _95059 |
|
650 | 7 |
_aCOMPUTERS / General _2bisacsh _95150 |
|
650 | 7 |
_aTECHNOLOGY / Engineering / Industrial _2bisacsh _910902 |
|
700 | 1 |
_aLeondes, Cornelius T. _911543 |
|
710 | 2 |
_aCRC Press. _910740 |
|
856 | 4 | 0 |
_3Taylor & Francis _uhttps://www.taylorfrancis.com/books/9780429124327 |
856 | 4 | 2 |
_3OCLC metadata license agreement _uhttp://www.oclc.org/content/dam/oclc/forms/terms/vbrl-201703.pdf |
942 | _cEBK | ||
999 |
_c69998 _d69998 |