000 | 03616nam a22005295i 4500 | ||
---|---|---|---|
001 | 978-3-031-79348-6 | ||
003 | DE-He213 | ||
005 | 20240730164301.0 | ||
007 | cr nn 008mamaa | ||
008 | 220601s2012 sz | s |||| 0|eng d | ||
020 |
_a9783031793486 _9978-3-031-79348-6 |
||
024 | 7 |
_a10.1007/978-3-031-79348-6 _2doi |
|
050 | 4 | _aTA174 | |
072 | 7 |
_aTBD _2bicssc |
|
072 | 7 |
_aTEC016000 _2bisacsh |
|
072 | 7 |
_aTBD _2thema |
|
082 | 0 | 4 |
_a620.0042 _223 |
100 | 1 |
_aWhitman, David. _eauthor. _4aut _4http://id.loc.gov/vocabulary/relators/aut _983518 |
|
245 | 1 | 0 |
_aFundamentals of Engineering Economics and Decision Analysis _h[electronic resource] / _cby David Whitman, Ronald Terry. |
250 | _a1st ed. 2012. | ||
264 | 1 |
_aCham : _bSpringer International Publishing : _bImprint: Springer, _c2012. |
|
300 |
_aXIV, 205 p. _bonline resource. |
||
336 |
_atext _btxt _2rdacontent |
||
337 |
_acomputer _bc _2rdamedia |
||
338 |
_aonline resource _bcr _2rdacarrier |
||
347 |
_atext file _bPDF _2rda |
||
490 | 1 |
_aSynthesis Lectures on Engineering, _x1939-523X |
|
505 | 0 | _aIntroduction -- Interest and the Time Value of Money -- Project Evaluation Methods -- Service Producing Investments -- Income Producing Investments -- Determination of Project Cash Flow -- Financial Leverage -- Basic Statistics and Probability -- Sensitivity Analysis. | |
520 | _aThe authors cover two general topics: basic engineering economics and risk analysis in this text. Within the topic of engineering economics are discussions on the time value of money and interest relationships. These interest relationships are used to define certain project criteria that are used by engineers and project managers to select the best economic choice among several alternatives. Projects examined will include both income- and service-producing investments. The effects of escalation, inflation, and taxes on the economic analysis of alternatives are discussed. Risk analysis incorporates the concepts of probability and statistics in the evaluation of alternatives. This allows management to determine the probability of success or failure of the project. Two types of sensitivity analyses are presented. The first is referred to as the range approach while the second uses probabilistic concepts to determine a measure of the risk involved. The authors have designed the text to assist individuals to prepare to successfully complete the economics portions of the Fundamentals of Engineering Exam. Table of Contents: Introduction / Interest and the Time Value of Money / Project Evaluation Methods / Service Producing Investments / Income Producing Investments / Determination of Project Cash Flow / Financial Leverage / Basic Statistics and Probability / Sensitivity Analysis. | ||
650 | 0 |
_aEngineering design. _93802 |
|
650 | 0 |
_aMaterials. _97549 |
|
650 | 0 |
_aProfessional education. _941513 |
|
650 | 0 |
_aVocational education. _941514 |
|
650 | 1 | 4 |
_aEngineering Design. _93802 |
650 | 2 | 4 |
_aMaterials Engineering. _932311 |
650 | 2 | 4 |
_aProfessional and Vocational Education. _941516 |
700 | 1 |
_aTerry, Ronald. _eauthor. _4aut _4http://id.loc.gov/vocabulary/relators/aut _983521 |
|
710 | 2 |
_aSpringerLink (Online service) _983523 |
|
773 | 0 | _tSpringer Nature eBook | |
776 | 0 | 8 |
_iPrinted edition: _z9783031793479 |
776 | 0 | 8 |
_iPrinted edition: _z9783031793493 |
830 | 0 |
_aSynthesis Lectures on Engineering, _x1939-523X _983524 |
|
856 | 4 | 0 | _uhttps://doi.org/10.1007/978-3-031-79348-6 |
912 | _aZDB-2-SXSC | ||
942 | _cEBK | ||
999 |
_c85523 _d85523 |